EasyManua.ls Logo

Fujitsu ARYG72LHTA - Page 20

Fujitsu ARYG72LHTA
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
01-16
3. Defrost Flow Chart
The defrosting shall proceed by the integrating operation time, outdoor temperature
and outdoor heat exchanger temperature as follows.
(Not defrosted for 10 minutes)
Heating operation start : Compressor ON
After compressor operation time passed for
1 minute, when a high-pressure sensor
detected more than 2.09MPaG.
or
Compressor ON time: Maximum 15 minutes
Defrost end
Compressor
integrating
operation:
Over 22 minutes
Compressor
integrating
operation:
Over 62 minutes
Outdoor
heat exchanger
temp.:
Below - 9°C
Outdoor
heat exchanger
temp.:
Below - 5°C
Compressor
integrating
operation:
Over 35 minutes
2nd and later defrost
Compressor : OFF
Outdoor fan motor : OFF
30 sec later 4-way valve : OFF
36 sec later compressor : ON
Compressor
integrating
operation:
Over 240 minutes
Integrating defrost
(Constant monitoring)
Defrost Indicator:
[Operation lamp]
6 sec ON / 2 sec OFF
Defrost start
Outdoor
heat exchanger
temp.:
Below - 10°C
Outdoor
heat exchanger
temp.:
Below - 3°C
Compressor
OFF count :
40 times
1st defrost
Fan defrost
[Outdoor temperature]
-10
5

Other manuals for Fujitsu ARYG72LHTA

Related product manuals