- 27 -
VS AND VA ADJUSTMENT
When the Main Power Supply PCB and PDP panel are replaced, Vs and VA must be
adjusted.
Preparation : Within 3 minutes after power on.
Adjustment : Adjust the V
S
and V
A
in the no-signal state.
Check points : Refer to the drawing shown below.
Adjustment points : Refer to the drawing shown below.
Adjustment value : Within +/- 0.2V of voltage indicated on the label of the PDP panel.
CN508
VS & VA
check point
CN23
1 pin V
A
4 pin GND
8 pin V
S
- MAIN POWER SUPPLY PCB (M03DJ-PCB) -
T4
T3
T2
CN1
CN2
CN352
CN507
CN351
CN502
CN509
CN7
CN901
CN6
CN23
CN3
ADJ.
VR582
VS
ADJ
VR581
V
A
110