EasyManua.ls Logo

FUZRR FR2000+ - Battery Instructions; Field Application; Multi-Point Grounding System

FUZRR FR2000+
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
In the data review state, long press the "SET" button, then
press the "POWER" button to delete the stored data
. Battery Instructions
When the voltage drops to 5.2V, the battery symbol " " is
displayed. Please replace the battery. Low battery voltage affects
measurement accuracy.
I. Field Application
1. Multi-Point Grounding System
As for the multi-point grounding system (such as electricity
transmission tower grounding system, grounding cable
communications systems, certain buildings, etc.), They usually
pass the overhead ground wire (cable shielding layer) connected
to form a grounding system.See below. As the Meter is in the
above measurement, its equivalent electric circuit is shown in the
figure below:

Related product manuals