EasyManua.ls Logo

Galaxy G9000S User Manual

Galaxy G9000S
6 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
IMPORTANT!
This Step-by-Step guide should be given to the customer
after installation and demonstration.
Instantaneous Electric Shower
Installation Instructions
Technical Hotline
Telephone: 0844 372 7766 Fax: 0844 372 7767
Email: technical-services@applied-energy.com
9.00 am - 5.00 pm Monday to Friday
SERVICE POLICY
In the event of you needing to contact the Galaxy Technical Hotline, the following
procedure should be followed:-
1
If a service call is booked, you or a representative must be present
during the Engineers visit.
Before telephoning the Galaxy Technical Hotline you should ensure
that you have the model number, power rating, serial number and
date of purchase.
The Galaxy Technical Hotline will be able to inform you whether the
fault can be rectified by the provision of a replacement part or an on
site visit by a Qualified Service Engineer.
If the product is no longer covered by the Guarantee, a charge will
be made for the site visit and for any parts supplied.
A charge will be made where a call under the terms of the guarantee
has been booked and a failure was not product related, or an engineer
arrives and is not able to gain access.
2
3
4
5
PART No. 7300006 - 01/2011
G
S
90009000
Question and Answer IconNeed help?

Do you have a question about the Galaxy G9000S and is the answer not in the manual?

Galaxy G9000S Specifications

General IconGeneral
BrandGalaxy
ModelG9000S
CategoryPlumbing Product
LanguageEnglish

Summary

Packing Contents

General Advice to Shower Unit Users

Shower Unit Operation

Advice for users on shower unit operation, water flow, and temperature.

Important Operational Advice

Key points on safe operation, including switching off and outlet use.

General Layout of a Shower Installation

Product Positioning Guide

Guidance on where to position the shower unit for optimal installation.

Installation

Installation Procedure

Steps for mounting the shower unit, drilling, and fixing to the wall.

Plumbing Connection Advice

Notes on connecting the water supply, flushing pipework, and leak checks.

Plumbing Connection

Plumbing Connection Procedure

Instructions for connecting the mains water supply to the shower unit inlet.

Electrical Connection

Electrical Specifications

Details on power ratings, cable sizes, and circuit breaker requirements.

Fitting the Cover into Position

Cover Fitting and Initial Setup

Steps for fitting the cover, initial water fill, and setting the power knob.

Riser Rail & Soap Dish Fitting Instructions

Riser Rail and Soap Dish Fitting

Instructions for installing the riser rail, handset height adjuster, and soap dish.

Commissioning the Shower

Commissioning Steps

Procedures for checking electrical supply, water flow, and temperature controls.

Operating the Shower

Shower Operation Guide

How to select power settings, adjust temperature, and turn the shower on/off.

Temperature Adjustment Note

Explanation of how temperature is adjusted via water flow control.

Operating Features

Power Neon Indicator

Description of the power indicator light and its function.

Overheat Indicator Function

Explanation of the overheat indicator and troubleshooting flow issues.

Showerhead Cleaning Instructions

Showerhead Cleaning

Guidance on daily cleaning and periodic maintenance to remove limescale.

Guarantee

Product Guarantee Details

Information on the two-year guarantee, terms, and conditions.

Related product manuals