BURE STANDARD/BURE S/BURE LOW
GATERD.SE8
Battery charging
Battery charging must take place when the walker is not in use (the battery can never be overcharged).
Charging is carried out by inserting the plug in a wall socket.
The battery should be charged at least 24 hours before rst use.
5. Other instructions T-Motion
Control box wiring diagram
To handle couplings as below, the control box cover must be removed. This is done with the help of a
screwdriver or similar - see special marking on the control box.
1. Socket for the raise/lower actuator. NOTE! Make sure that the connectors are connected to the correct
socket as this can otherwise damage actuators
2. Remote control socket
3. Battery terminal socket
4. Plug socker (NOTE: Plugs must always be connected to the control box for IP classication to be valid).
Laddning av batteri
• Plus in to 230V wall socket. Charging starts automatically and the battery LED blinks green.
• Charge the battery for at least 8 hours.
• If the product will not be used for an extended period of time (more than 3 weeks), we recommend that the
battery is removed from the control box. In this way, the risk of the battery being destroyed, as the control
box consumes a small amount of power even the when product is not used, is eliminated.
1
2
3
4