23
Installation Instructions
REPLACE THE BASE GRILLE
Replace the grille by installing the two Phillips
head screws.
7
SET THE CONTROLS
Set the controls to the recommended setting.
8
START THE ICEMAKER
Set the icemaker power switch to the I (on)
position. The icemaker will not begin to operate
until it reaches its operating temperature of
15°F (–9°C) or below. It will then begin operation
automatically. It will take 2–3 days to fill
the ice bin.
NOTE:
In lower water pressure conditions, the water
valve may turn on up to 3 times to deliver
enough water to the icemaker.
9
Power
switch

Other manuals for GE 22