EasyManua.ls Logo

GE Carestation 650c - Mount Machine to Pendant Lift

GE Carestation 650c
6 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
M1807013 Rev. F 01 15 Page 3 of 6
This document contains confidential information or proprietary information of General Electric Company or its af-
filiates. Neither the document nor the information therein is to be reproduced, distributed, used, or disclosed, either
in whole or in part, except as specifically authorized in writing by a General Electric Company and must be returned
upon request.
Installation Instructions, For Field Use
For future reference add to your Technical Reference Manual
Datex-Ohmeda, Inc.
3030 Ohmeda Drive
PO Box 7550
Madison, WI 53707-7550, USA
7. Move the machine to the pendant lift. Ensure the lift pins (D) align properly with machine pendant mount holes (E).
8. Turn the tilt adjustment screw clockwise till the hinge supports the anesthesia machine evenly.
WARNING This step is essential safety related, make sure it is completed and record the result.
9. Raise the pendant lift until it is fully mated with the pendant mount.
10. After mounting the machine to the ceiling pendant and all leveling adjustments have been made according to the
ceiling pendant manufacturer’s procedures, adjust the two tilt blocks (F) by positioning them against each side of the
E
D

Related product manuals