Do you have a question about the GE IAC53B and is the answer not in the manual?
Specifies pickup range, frequency, and tap availability for the time unit.
Details continuous and one-second ratings for the instantaneous unit.
Procedures for initial inspection and acceptance testing of the relay.
Guidance on testing the pickup and time settings of the time-overcurrent unit.
Tests to be performed immediately after installing the relay.
Specifies pickup range, frequency, and tap availability for the time unit.
Details continuous and one-second ratings for the instantaneous unit.
Procedures for initial inspection and acceptance testing of the relay.
Guidance on testing the pickup and time settings of the time-overcurrent unit.
Tests to be performed immediately after installing the relay.
| Coil Voltage | 24VDC |
|---|---|
| Coil Power | 0.9 W |
| Mechanical Life | 10, 000, 000 operations |
| Ambient Temperature | -40°C to +70°C |
| Contact Configuration | DPDT (Double Pole Double Throw) |
| Contact Form | 2 Form C |
| Operate Time | 15ms max |
| Electrical Life | 100, 000 operations |
| Dielectric Strength | 1500 VAC, 50/60 Hz for 1 minute between coil and contacts; 750 VAC, 50/60 Hz for 1 minute between open contacts |