EasyManua.ls Logo

GE JCP910 Installation Instructions

GE JCP910
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TOOLS YOU WILL NEED
CAUTION:
BEFORE YOU BEGIN
Read these instructions carefully and completely.
IMPORTANT – Save these instructions for local
inspector’s use.
IMPORTANT – Observe all governing codes and
ordinances.
Note to Installer – Be sure to leave these instructions with
the Consumer.
Note to Consumer – Keep these instructions for future
reference.
30” Electric Cooktop
Installation
Instructions
JCP910, JCP930
NOTE: This appliance must be properly grounded.
Skill level – Installation of this appliance requires basic
mechanical and electrical skills.
Completion time – 2–3 hours.
Proper installation is the responsibility of the installer.
Product failure due to improper installation is not
covered under the Warranty.
PARTS INCLUDED
1/8” Drill Bit and
Electric or Hand Drill
Phillips
Screwdriver
Foam Strips
4 screws
Pub. No. 31-10602
01-05 JR
Printed in the United States
1
Questions? Call 1.800.361.3400 or visit our Website at: www.GEAppliances.ca
2 Hold Down Brackets
Ruler or
Straightedge
Hand or
Saber Saw
Pencil
Junction
Box
Wire Nuts
MATERIALS NEEDED

Other manuals for GE JCP910

Question and Answer IconNeed help?

Do you have a question about the GE JCP910 and is the answer not in the manual?

GE JCP910 Specifications

General IconGeneral
Number of Burners5
Surface MaterialGlass
Power BoostYes
Child LockYes
Fuel TypeElectric
Burner TypesRadiant
Ignition TypeElectronic
Cooktop MaterialCeramic Glass
ColorBlack
TypeElectric
Width30 in
Depth21.25 in
Height2.5 inches

Related product manuals