EasyManua.ls Logo

Gemm New Runner BCB/10US - Page 4

Default Icon
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BCB US Rev.00 01-2019 pag. 4
5.
INSTALLATION
20
5.1 Preparation for installation
5.2 Unpacking
5.2.1 Means required
5.2.2 Unpacking procedure
5.3 Handling the blast chiller
5.3.1 Means required
5.3.2 Handling the unpacked blast chiller
5.4 Blast chiller assembly
6.
SETTING UP
22
6.1 Connections
6.1.1 Electrical connection
6.2 Preliminary checks
6.2.1 Regulation
7.
USE
23
7.1 Reccomended use
7.2 Non recommended use
7.3 Control panel
7.4 Control procedures
7.5 Product recommended use
7.6 Soft chilling
7.6.1 Setting and Selecting of soft chilling cycle (Soft blast chilling)
7.7 Hard chilling
7.7.1 Setting and Selecting of hard chilling cycle (Hard blast chilling)
7.8 Freezing
7.8.1 Setting and Selecting a of freezing cycle
7.9 Special functions and uses
7.9.1 Pre-chilling function
7.9.2 Defrost
7.9.3 Long idle perdios

Related product manuals