5.1 – Preparation for installation
5.2 – Unpacking
5.2.1 – Means required
5.2.2 – Unpacking procedure
5.3 – Handling the blast chiller
5.3.1 – Means required
5.3.2 – Handling the unpacked blast chiller
5.4 – Blast chiller assembly
7.1 – Reccomended use
7.2 – Non recommended use
7.3 – Control panel
7.4 – Control procedures
7.5 – Product recommended use
7.6 – Soft chilling
7.6.1 – Setting and Selecting of soft chilling cycle (Soft blast chilling)
7.7 – Hard chilling
7.7.1 – Setting and Selecting of hard chilling cycle (Hard blast chilling)
7.8 – Freezing
7.8.1 – Setting and Selecting a of freezing cycle
7.9 – Special functions and uses
7.9.1 – Pre-chilling function
7.9.2 – Defrost
7.9.3 – Long idle perdios