Maintenance Level 1 Level 2 Level 3 Level 4 Level5
Tasks
Recom- Task Task Required Task Task Required Task
mended Comp. Comp. to be done Comp. Required Comp. to be done Comp.
to be done (Date- Required (Date- Semi- (Date- to be done (Date- Bi- (Date-
monthly/ Initials) to be done Initials) annually/ Initials) Annually/ Initials) annually/ Initials)
10 hrs. 6 months 50 hrs. 100 hrs. 250 hrs.
1. Disable the unit
from operating
per the first page
warning.
2. Check the engine
oil level. Adjust
as necessary.
3. Check the natural
gas delivery
system for leaks
and correct
pressure on gas
engine driven
units. Tighten
connections as
necessary.
4. Check the air
inlets and outlets
for debris. Clean
as necessary.
5. Check the battery
electrolyte level
and specific
gravity if
accessible. Adjust
as necessary.
6. Check the battery
posts, cables,
and charger for
loose
connections,
corrosion, and
proper operation.
Correct as
necessary.
7. Check the unit
wiring for loose
connections,
corrosion, and
damage. Correct
as necessary.
8. Check the engine
valve clearance.
Adjust as
necessary.
9. Visually inspect
the unit looking
for leaks, wear or
damage, loose
connections or
components, and
corrosion. Correct
as necessary.
Section 5 — Maintenance
Air-cooled 15 kW Generators