EasyManua.ls Logo

Genius MILORD 5 User Manual

Genius MILORD 5
5 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
6
ENGLISH
Notes on reading the instruction
Read this installation manual to the full before you begin installing the product.
The symbol indicates notes that are important for the safety of persons and for the good condition of the automated system.
The symbol draws your attention to the notes on the characteristics and operation of the product.
CE DECLARATION OF CONFORMITY FOR MACHINES
(DIRECTIVE 98/37/EEC)
Manufacturer: GENIUS S.p.A.
Address: Via Padre Elzi, 32 - 24050 - Grassobbio- Bergamo - ITALY
Declares that: Operator mod. MILORD 5 - MILORD 8 - MILORD 424
is built to be incorporate in a machine or to be assembled with other machinery to create a machine under the provisions of Directive 98/37/EC;
conforms to the essential safety requirements of the other following EEC directives:
73/23/EEC and subsequent amendment 93/68/EEC.
89/336/EEC and subsequent amendment 92/31/EEC and 93/68/EEC
Furthermore, the manufacturer declares that the machinery must not be put into service until the machine into which it will be incorporated or of which
it will become a part has been identified and its conformity to the conditions of Directive 98/37/EC has been declared.
Grassobbio, 01-06-2006
Managing Director
D. Gianantoni
INDEX
1. DESCRIPTION AND TECHNICAL SPECIFICATIONS page.7
2. ELECTRICAL SET-UP page.7
3. INSTALLING THE AUTOMATED SYSTEM page.7
3.1. PRELIMINARY CHECKS page.7
3.2. INSTALLING THE OPERATOR page.7
3.3. INSTALLING THE RACK page.8
3.4. POSITIONING THE STROKE-LIMIT MAGNETS page.9
4. START-UP page.10
5. AUTOMATED SYSTEM TEST page.10
6. MANUAL MODE OPERATION page.10
7. SPECIAL APPLICATIONS page.10
8. MAINTENANCE page.10
9. REPAIRS page.10
Question and Answer IconNeed help?

Do you have a question about the Genius MILORD 5 and is the answer not in the manual?

Genius MILORD 5 Specifications

General IconGeneral
BrandGenius
ModelMILORD 5
CategoryGate Opener
LanguageEnglish

Summary

Description and Technical Specifications

Electrical Set-up

Installing the Automated System

Preliminary Checks

Ensures the gate structure and movement meet requirements for automated system operation.

Installing the Operator

Steps for assembling and positioning the operator and its foundation plate.

Installing the Rack

Rack Installation Details

Procedure for preparing, positioning, and welding rack elements to the gate leaf.

Positioning the Stroke-Limit Magnets

Magnet Placement Procedure

Correctly positions magnets that activate the gate's open/closed limit switches.

Start-Up

Automated System Test

Manual Mode Operation

Manual Gate Movement and Restoration

Instructions for manual operation during faults and restoring normal system function.

Special Applications

Maintenance

Repairs

Related product manuals