EasyManua.ls Logo

Geyserwise Delta T - Default Chapter; Table of Contents

Geyserwise Delta T
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.geyserwise.co.za
Index
Warranty
Components
About the GeyserWise
Application
Installation
Technical information
Improper usage
Dangers during installation
Exclusion of liability
Installation 220V pumped solar system
Installation procedure steps
Apply all safety measures
Install control box
Install the display unit
Remove thermostat and replace with supplied geyser temperature probe
Install the collector probe
Connections on control box summary
Complete all electrical connections
Main power supply
Connect wire between controller and geyser
Connect wire between controller and pump
Replace lid on control box
Display
Adjusting day of the week
Adjusting the real time clock
Maximum temperature setting
Setting solar differential (default 7
º
C)
Setting the anti-freeze temperature
Setting geyser timers
Eliminating a timer
Holiday mode setting
Manually overriding element timers
Pump indicator
Element indicator
Hour counter
Error codes summary
E2
E3
E4
E5
E7
E8
E9
General
Temperatures expected above 90
º
C
How to deal with power failure in case of 220V pump application
How to prevent loose connections in the terminal block
GeyserWise anti-freeze function
1
2
3
3
3
3
4
4
4
5
5
6
6
7
7
9
10
11
11
11
13
13
14
15
16
16
17
17
18
19
19
19
19
20
20
21
22
22
23
24
24
25
25
26
26
27
27
28