EasyManua.ls Logo

Gianneschi ECOINOX C.E. - Priming and Start Up

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PRIMING AND START UP
START- UP
1. With the electrical power disconnected, check the shaft turns freely (hexagonal wrench or
a screwdriver should be into the slot of the shaft).
2. Unscrew the priming plug on the body pump’s top side.
3. Push the no return valve to let the air in the body pump go away.
4. Fill body-pump completely whit water.
5. Tighten priming plug.
6. Open the valve on the suction line.
7. Close the valve on the outlet line.
8. Turn the pump on and open slowly the valve on the outlet line.
9. Check the running direction
10. After closing the outlet valve, the pump will build up to its maximum pressure and then
turn off after approximately 10/15 seconds. Pressure at shut off will vary slightly
depending on the main voltage (only in D.C. current).
ATTENTION ! ! !
Make sure the pump is working in its operation field
(check the label located on the pump motor and compare to the voltage supply).

Related product manuals