Do you have a question about the Giersch MG2-ZM-L and is the answer not in the manual?
Details on how to switch on the burner for start-up and calibration.
Procedure for presetting values using setting tables for the air flap.
Steps to set the high load air flap and move to the next curve point.
Identifier for curve programming and calibration steps with flame detection.
Procedure for setting ignition position, ignition ON/OFF, and flame start position.
Adjusting outputs for high and low load operation using gas flow or nozzle pressure.
Details on the KEV 300 1" gas burner and its gas train components.