EasyManua.ls Logo

Glow Brand C95 - User Manual

Default Icon
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installation & Operation Manual
ANSI Z21.13-2017 CSA 4.9-2017
To Installer: Afx this manual adjacent to the appliance.
To Consumer: Retain these instructions for future reference
WARNING If the information in these instructions is not followed exactly, a re or explosion
may result, causing property damage, personal injury or death.
Do not store or use gasoline or other ammable vapors and liquids in the vicinity of this or any other
appliance.
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electrical switch.
Do not use any phone in your building.
Immediately call your gas supplier from a neighbour’s phone.
Follow the gas supplier’s instructions.
If you cannot reach your gas supplier, call the re department.
Installation and service must be performed by a qualied installer, service agency or
the gas supplier.
Models
V.20180807
C95 & C140
Condensing Combination Boiler

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Glow Brand C95 and is the answer not in the manual?

Summary

HAZARD SYMBOLS & DEFINITIONS

Prior to Installation

Key steps and considerations before beginning the boiler installation process.

OPERATING INSTRUCTIONS

FIRE AND EXPLOSION HAZARD

General Information

General Installation Requirements

Conformity to codes, manual, and safety standards for boiler installation.

Installer Responsibilities

Qualified installer's duties for safe and compliant boiler installation.

Technical Characteristics

Technical Data

Detailed specifications and performance data for C95 and C140 models.

Unit Performance

Venting

Installation Using Indoor Combustion Air

Direct Vent Installation

Venting Rules and Guidelines

Condensate Drain

Boiler and Heating System Piping

Combi Boiler Operation

Combi DHW Plumbing & Set-up

Connections, screen cleaning, and hard water considerations for DHW.

Instantaneous DHW (w;o Storage Tank)

Operation of domestic hot water heating without a storage tank.

Combi Boiler Operation

How the boiler manages central heating and domestic hot water demands.

Pre-Heat Modes

Glow Combi Boiler w;DHW Storage Tank

Gas Piping

Installation

General requirements for installing gas piping to the boiler.

Gas Valve and Burner Setup

Procedures for gas line pressure measurement and burner setup.

Prior to Lighting the Combi Boiler

Steps to take before turning on gas and lighting the boiler.

Checking the gas pressure

Procedure for verifying gas line pressure to the boiler.

Field Wiring

Line Voltage Connections

Instructions for connecting the boiler's main power supply.

Starting Up the Boiler

Start-Up & Ignition Safety Shuttoff Test

Procedure for initial boiler startup and safety shutoff testing.

Combustion Analysis

Throttle Adjustment

Controls

Initial Power-up

Main Menu

Installer Menu (2.000)

DHW Modes

CH Modes

Special Operations

Lockout, Blocking Errors & Warnings

Lockout Error

Indicates boiler lockouts, displays codes, and how to clear them.

Blocking Errors

Warnings

Troubleshooting

Display Errors

Maintenance

Important Product Safety Information

Cleaning Primary Heat Exchanger

Replacing the Gas Valve

Plate Heat Exchanger Maintenance

Warranty

COMBI BOILER COMMISSIONING SHEET

Glow Brand C95 Specifications

General IconGeneral
BrandGlow Brand
ModelC95
CategoryBoiler
LanguageEnglish

Related product manuals