55
• Assemble the six columns with parts 1PV1135 + 1 PG + 4 PEAO using the TV bolts.
NOTE: THE NUTS SHOULD ALWAYS BE LOCATED ON THE INSIDE. THE ENTIRE PROCESS SHOULD BE
CARRIED OUT ON FIRM AND LEVEL GROUND, BEFORE EXCAVATING THE FOUNDATIONS. WE RECOMMEND
ASSEMBLING THE PARTS IN A LARGE AND LEVEL SPACE, TO MAKE IT EASIER.
1
Place the part PEU2 so that the four open holes on the sides with the second and third line of holes of the PG (see
diagram 1b) and that the side where the holes are rests on the upper part. Bolt the TV bolts when the PEAO parts have
been installed.
2
Bolt the two PEAO parts on each side of the PG crossbar, using the TV bolts and a spanner no. 13.
3
Place the other PEU2 part on the lower part of the PV1135. Fix the column PV1135 to the PG beam bolt the TV bolts
across the PEAO.
ASSEMBLY OF THE COLUMNS
21
1x =
1 PV1135 + 1 PG + 4 PEAO + 2 PEU2 + 1PEU
Trenches
Columns
C.Metalic
Z
C
CN
334cm
483cm
ZAZA
ZB
CN
C
AP
AP
AP
AP
AP
AP
AP
AP
AP AP
3
PV1185