EasyManua.ls Logo

Gree FGR25Pd/DNa-X - Page 41

Gree FGR25Pd/DNa-X
129 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GREE Duct type split Air conditioner Inverter Series
39
(4) Icon indicates that there is problem found during debugging. Debugging will not be
completed unless problem is solved (after problem is solved, step without “OK” button will switch
to the next step automatically, otherwise user needs to click “OK” to continue). Click icon
and relevant information detected in this step will be displayed for your reference in order to
solve problems. Click “Close” to close the pop-up.
(5) During debugging, a click on “Break” can stop debugging. Click “Start” to resume debugging
and then debugging will be finished step by step. For No.10 ODU Valves Check Before Startup,
there are “Back” and “Skip” buttons. If there is error in this step, you can back to step No.9 and
click “OK” to restart debugging on step No.10. If the error in step No.10 is U6 error (valve error
alarm), you can click “Skip”. In other cases, “Skip” button is null.
(6) Step 11, 13 and 14 are reserved steps. And step 13, 14, 15 and 16 are steps in parallel (only
one of the four will be selected according to actual needs).

Other manuals for Gree FGR25Pd/DNa-X

Related product manuals