EasyManuals Logo

Gree FP-85XD/B-T User Manual

Gree FP-85XD/B-T
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
Cassette Type Fan Coil Unit
6
5.3 Dimension of ceiling opening and location of the hoisting screw(as Fig.6)
680(Gaps between hoisting screw rods
)
840(Indoor unit )
890(Ceiling opening)
950 ( Decorated surface boards)
Hoisting screw (×4)
Water pipe
780(Gaps between hoisting screw rods)
840(Indoor unit)
890(Ceiling opening)
950 ( Decorated surface boards)
Fig.6
The drilling of holes in the ceiling must be done by the professional personnel.
The overlapping sections of the ceiling and the decorated surface boards should be
maintained at no less than 20mm(as Fig.7).
(160)
Above 20
Installation stands for main body of the uni
t
Ceiling
Fig.7

Other manuals for Gree FP-85XD/B-T

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree FP-85XD/B-T and is the answer not in the manual?

Gree FP-85XD/B-T Specifications

General IconGeneral
BrandGree
ModelFP-85XD/B-T
CategoryAir Conditioner
LanguageEnglish

Related product manuals