EasyManua.ls Logo

Gree GJC09AF-E6RNB3A

Gree GJC09AF-E6RNB3A
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual
Installation and Maintenance
39
Twist off screws xing the electric box, pull
out compressor wires and overload wires,
remove wires of ambient temperature
sensor, external tube temperature sensor
and discharge temperature sensor, and
then pull the electric upwards to remove
it.
ProcedureStep
4. Remove top cover
6. Remove Cross Beam and Air Louver
5. Remove electric box 1
Remove the screws xing top cover and
then remove the top cover.
Top cover sub-assy
Electric box 1
Screws
Cross Beam
Air Louver

Related product manuals