EasyManua.ls Logo

Gree GKH18K3HI - Page 27

Gree GKH18K3HI
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cassette Type Air Conditioner Unit
24
Fig.4.29
(5). The incline of attached drain hose should be 75 mm or less so that the drain outlet
does not have to withstand additional force.
≤75mm(3inch)
≤1000mm(39-3/8inch)
Drain hose(attachment)
Fig. 4.30
4.5.4 Testing of Drain Piping
After piping work is finished, check if drainage flows smoothly.
Shown in the Fig. 4.31, Add approximately 1liter of water slowly into the drain pan
and check drainage flow during COOL running.
Drain hose Test hole cover
Test hole
<Immiting water from the rest hole>
Plastic water pot [The length of
the pipe should be about
100mm(3-7/8inch)].
<Immiting water from the outlet vent terminal>
Above 100mm(3-7/8inch)
Drain vent for repair use (plastic stopper
is included) (drain the water in waterspoit
by this outlet vent)
Fig. 4.31

Other manuals for Gree GKH18K3HI

Related product manuals