DC Inverter Multi VRF System 
24 
 
 
5 Check Items after Installation and Test Operation 
5.1 Check Items after Installation 
Possible conditions due to improper 
installation 
Each part of the unit is installed securely? 
Unit may drop, shake or emit noise. 
Gas leakage test is taken or not? 
Insufficient cooling (heating) capacity 
Unit gets proper thermal insulation or not? 
There may be condensation and dripping. 
Drainage is smooth or not? 
There may be condensation and dripping. 
Is the voltage in accordance with the rated voltage 
specified on the nameplate? 
Unit may have malfunction or 
components may get damaged. 
is the electric wiring and pipe connection installed 
correctly? 
Unit may have malfunction or 
components may get damaged. 
Unit is securely grounded or not? 
Power cord meets the required specification? 
Unit may have malfunction or 
components may get damaged. 
Is the air inlet/outlet blocked? 
Insufficient cooling (heating) capacity 
Length of refrigerant pipe and the charging 
amount of refrigerant are recorded or not? 
The refrigerant charging amount is not 
accurate. 
Binding pieces on compressor feet are removed 
or not? 
Compressor may get damaged. 
 
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.