EasyManua.ls Logo

Gree GMV-ND28ZD/A-T

Gree GMV-ND28ZD/A-T
276 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GREE GMV5 INDOOR UNIT SERVICE MANUAL
175
Motor and fan
Precondition: The power supply has been disconnected.
Step
Diagram
Operation Procedure
2. Remove the filter. And the
air return cover plate.
●Remove the filter from the air
return frame.
●Use a screwdriver to unscrew the
air return cover plate.
3. Remove the rear
propeller housing and
Remove the front propeller
housing.
●Loosen the fasteners that
connect the rear propeller housing
with the front propeller housing
and remove the rear propeller
housing.
●Use a screwdriver to unscrew the
front propeller housing and then
remove the propeller housing.
4. Remove the motor.
●Remove the motor from the
support and remove the louver
from the motor axle. Then, remove
the motor.
5. Install a new motor.
●Assemble units based on the
reverse order of this procedure
and power on the units for test.
GMV-NDX224P/A-T, GMV-NDX250P/A-T, GMV-NDX280P/A-T
Motor and fan
Precondition: The power supply has been disconnected.
Step
Diagram
Operation Procedure
1. Remove the cover plate
component.
●Use a screwdriver to unscrew the
cover plate component.
2. Remove the line
connecting to the motor.
●Use a screwdriver to unscrew the
electric box cover.
●Remove from the master board
the line connecting to the motor
and remove the tie.

Table of Contents

Other manuals for Gree GMV-ND28ZD/A-T

Related product manuals