EasyManua.ls Logo

Gree GPC09AK-K5NNA1A

Gree GPC09AK-K5NNA1A
224 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN | 41
Use the drainage option at the middle drainage port
Remove the cap from the drainage port by
turning it counter clockwise.
Remove the rubber stopper from the spout.
Screw the drain hose adapter to the port by
turning it clockwise.
Push the drainage hose on to the adapter and
secure it with a pipe hoop.
The collected water can be automatically emptied from the middle drainage port into a floor drain
by attaching a hose with an inner diameter of 14 mm (not included).
Attention:
Place the air conditioner on a level surface, make sure the hose is clear of any obstructions and
pointing downward. Otherwise, not properly drained water might fill up the chassis and cause
the device to shut o. If that should occur, empty the water in the chassis and check location and
hose for proper setup.

Other manuals for Gree GPC09AK-K5NNA1A

Related product manuals