DC Inverter U-match Series Duct Type Unit 
 
3.4 Check after Installation 
Check Items after Installation. 
 
Possible events due to improper insta
lation 
Is the main body installed 
The unit may fall down, vibrate or produce 
Did you do water leakage test? 
Cooling capacity may become unsatisfactory. 
Is the unit well insulated from 
Condensate, water drops may occur. 
Does water drainage go well? 
Condensate, water drops may occur. 
Is the voltage consistent with that 
The unit may fail or its components may get 
Are the wires and pipes installed 
The unit may fail or its components may get 
Has the unit been safely 
Risk of electric leakage. 
Do the specifications of wires 
comply with the requirement? 
The unit may fail or its components may get 
Is there any obstacle blocking 
the air inlet and outlet of the 
Cooling capacity may become unsatisfactory. 
Have you recorded the length of 
refrigerant pipe and the 
refrigerant charging amount? 
The refrigerant charging amount can’t be 
controlled. 
  3.5 Test Running 
Preparation before connecting the power: 
(1)   Power must not be connected if the installation work is not completed.   
(2)   Control circuit is correct and all the wires are firmly connected.   
(3)   Cut-off valves of the gas pipe and liquid pipe are open.   
(4)   The inside of the unit should be clean. Take irrelevant objects out if there 
is any.   
(5)   After checking, re-install the front side plate.   
Operation after connecting the power: 
(1)   If all the above works are finished, power on the unit. 
(2)   If  the  outside  temperature  is  more  than  30°C,  heating  mode  can’t  be 
enabled.   
(3)   Make sure the indoor and outdoor units can run normally.