this task.
Flushing shall be achieved by breaking the vacuum in the system with OFN
and continuing to fill until the working pressure is achieved, then venting to
atmosphere, and finally pulling down to a vacuum. This process shall be repeated
until no refrigerant is within the system. When the final OFN charge is used, the
system shall be vented down to atmospheric pressure to enable work to take place.
This operation is absolutely vital if brazing operations on the pipework are to take
place.
Ensure that the outlet for the vacuum pump is not close to any ignition sources
and there is ventilation available.
5.4.7 Charging Procedures
In addition to conventional charging procedures, the following requirements
shall be followed.
(1) Ensure that contamination of different refrigerants does not occur when
using charging equipment. Hoses or lines shall be as short as possible to
minimize the amount of refrigerant contained in them.
(2) Cylinders shall be kept upright.
(3) Ensure that the refrigeration system is earthed prior to charging the
system with refrigerant.
(4) Label the system when charging is complete (if not already).
(5) Extreme care shall be taken not to overfill the refrigeration system.
(6) Prior to recharging the system it shall be pressure tested with OFN. The
system shall be leak tested on completion of charging but prior to
commissioning. A follow up leak test shall be carried out prior to leaving
the site.
5.4.8 Decommissioning
Before carrying out this procedure, it is essential that the technician is
completely familiar with the equipment and all its detail. It is recommended good
practice that all refrigerants are recovered safely. Prior to the task being carried out,
an oil and refrigerant sample shall be taken in case analysis is required prior to
re-use of reclaimed refrigerant. It is essential that electrical power is available
before the task is commenced:
(1) Become familiar with the equipment and its operation.

Other manuals for Gree GUD71P/A-T

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GUD71P/A-T and is the answer not in the manual?

Gree GUD71P/A-T Specifications

General IconGeneral
BrandGree
ModelGUD71P/A-T
CategoryAir Conditioner
LanguageEnglish

Related product manuals