EasyManua.ls Logo

Gree GVH24AK-K3DNC6A - Indoor Unit Wiring Procedure

Gree GVH24AK-K3DNC6A
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
Installation and Maintenance
Service Manual
Test Point
No.
Test Point Corresponding Component Test value under normal condition
Test1 Between A and C Neutral wire wire and live wire 160V~265V
Test2 Between B and C Neutral wire wire and live wire 160V~265V
Test3 Between D and E Electrolytic capacitor of DC bus bar DC 180V~380V
Test4 Between F and G
Electrolytic capacitor of switch power
supply
DC 180V~380V
Test5 Two ends of diode D10 in
H
D10 (IPM module bootstrap + 15V
power supply)
DC 14.5V~15.6V
Test6 Two ends of electrolytic capacitor C708 in I C708 (+15V power supply) DC 14.5V~15.6V
Test7 Two ends of electrolytic capacitor C715 in J C715 (+12V power supply) DC 12V~13V
Test8 Two ends of electrolytic capacitor C710 in K C710 (+5V power supply) DC 5V
Test9 Two ends of electrolytic capacitor C226 in L C226 (+3.3V power supply) DC 3.3V
Test
10
Two ends of electrolytic capacitor C24 in M C24 DC 56V
Test11 Between N point and GND
N end of R78 grounding (signal receiving
terminal of ODU)
Fluctuate between 0~3.3V
Test12 U12 in P Between 1 and 2 of U12 pin Fluctuate between 0~3.3V
Test13 Between O point and GND
O end of R75 grounding (signal
receiving terminal of ODU)
Fluctuate between 0~3.3V
Test14 U15 in Q Between 3 and 4 of U15 pin Fluctuate between 0~3.3V

Other manuals for Gree GVH24AK-K3DNC6A

Related product manuals