EasyManua.ls Logo

Gree GWH24KG-K3DNA5G - Page 80

Gree GWH24KG-K3DNA5G
101 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
77
Installation and Maintenance
Service Manual
Steps
Procedure
Points
4. Opening and closing of service cover
Remove a service
cover mounting screw.
Open service cover
upward.
A switch for eld setting is
not provided in particular.
5. Removal of front grille assembly
screws
Screw stoppers inside the
ap which were equipped in
the existing models are not
provided.
At the upper part there are 2
hooks in the left and the
right.
Remove the 5 screws,
in the right and the left,
which x the main body
with the front grille.
a
Disengage the hooks by
pressing knobs with a
screwdriver.
Disengage the 3 hooks
on the upper part.
In case that the hooks
are not pressed from
above, remove the front
panel and then remove
the grille while pushing
the hook through a
clearance between the
front grille and the heat
exchanger.
b
The front grille can be
removed in a manner to
pull out the upper part
forward and lift up the
lower part.
c
Hooks
Left
Center
Right

Related product manuals