EasyManua.ls Logo

Greentrees Hydroponics MULTI FLOW HYDROPONIC SYSTEM - Assembly Instructions; Controller Assembly and Reservoir Setup

Greentrees Hydroponics MULTI FLOW HYDROPONIC SYSTEM
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Unpack and identify all parts carefully Use the list below as a guide.
Assembly
The reservoirs we supply with the
system are blue with a white removable
lid. The lid has a four inch hole cut in
it. If you’re using a different reservoir,
you will need to cut a four inch hole in
the top and have a way to attach the
Fill/Drain Tube Mount.
Insert 10 of the ¾” Connectors into the grommets at the base of the
Controller.
NOTE: A small amount of lubricant like water, or dish soap and
water will make installing the connectors into the grommets much
easier.
Page 2
Items included with the 12 pot system
1 Controller Assembly
2 6 pot Add-On Kits
1 55 gallon reservoir
Items included with the 24 pot system
1 Controller Assembly
4 6 pot Add-On Kits
1 55 gallon reservoir
Items included with the 36 pot system
1 Controller Assembly
6 6 pot Add-On Kits
1 55 gallon reservoir
Items included with the 48 pot system
1 Controller Assembly
8 6 pot Add-On Kits
1 55 gallon reservoir
The Controller Assembly contains
1 Controller with timer.
2 Pumps, one Fill Pump and one Drain Pump
1 15 foot Roll of ½” Tubing
1 3 foot Roll of 5/8” Tube Wrap
1 Fill/Drain Tube Mount
1 Lid for Controller
5 ¾” Elbows
2 ½” Elbows
15 ¾” Connectors
10 ¾” Barbed Fitting End Caps
1 1-5/8” Screw
1 Instruction manual
Each 6 add on contains
6 Lower Pots with grommet installed
6 Upper Pots with drain holes
6 Tee fittings
1 Elbow fitting
1 Roll of ¾” tubing, approximately 20 feet