ARK 2.5H-A1
Quick Installation Manual
Installation environment
Max.
+50℃
Min.
-10℃
RH.
+5%~+95%
Installation tools
System size
1.Check
Check ARK 2.5H-A1 List
1-2
ARK 2.5H-A1 X1
Serial cable X1
Check HVC60050-A1 List
1- 1
HVC60050-A1 X1
Warranty card X1
Quick installation Manual X1
Power cable ( to battery) X1
Plug X1
Diagram of wiring connection
5-3
Note:
1、Before installing the system, ensure that the voltage difference of the battery pack is less than 0.5V;
2、For the same system, it is recommended to select the battery with the manufacturing date difference within 3 months,
otherwise the system capacity will be limited.
3、If there is a switch between PCS and battery, it is recommended to use a circuit breaker with rated voltage greater than
750V and rated current greater than 63A.
To PCS
Insert Plug
To PCS
Insert Plug
ARK 2.5H-A1 Series cable
ARK 2.5H-A1 cable
Battery+Battery-
CAN
PE
CAN
Battery- Battery+
PE
6.Terminal Connection
Power terminal
6-1
Communication terminal
6-2
1
8.Service and contact
Shenzhen Growatt New Energy Co., Ltd
86 0755 2747 1942
Growatt New Energy
6
5
HVC60050-A1
ARK 2.5H-A1
Power ON battery system
Power OFF battery system
a、Power on battery system:
Turn the circuit breaker to the "on" state,
then press the "POWER" button for 5-6 seconds,
and wait until the LED of the battery system lights up,
indicating that the power on is completed
7.Battery system switch operation
ARK 2.5H-A1 Connection end face introduction
5-2
1 2 3 4 5 6 7
Wir
e si
de
W
i
re s
id
e
b、Power off battery system:
Turn the circuit breaker to "off" to turn off the
entire battery system
4-13/F,Building A,Sino-German(Europe) Industrial Park,
Hangcheng Ave, Bao'an District, Shenzhen, China