2.Installation steps:
a.Please confirm the installation position and mark it. The central
position of the charging pile should be at least 1.3 meters above the
ground.
b. Compare the four locating holes on the hanging plate, and mark
the wall with Ф 8 Drill a 60mm deep hole at the mark and insert 4
pieces Ф 8 * 60 expansion pipe.
c.Fix the hanging plate to the wall with 4 M6 * 60 cross slot tapping
screws corresponding to the expansion pipe.
a
b-1
b-2
c
5
1.3M
The Wall
Locang
Holes