EasyManua.ls Logo

GW Instek LCR-819 User Manual

GW Instek LCR-819
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
LCR-800 Series User Manual
i
CONTENTS PAGE
1. INTRODUCTION……………………………..……... 1
2. PRECAUTIONS BEFORE OPERATION…….…………….
2-1.Unpacking the instrument………………….…………….
2-2.Checking the Line Voltage…………………..……………
2-3.Environment……………………………………..………..
2-4.Equipment Installation, and Operation…………………
2
2
2
3
3
3. PANEL DESCRIPTION…...……………………..………….. 4
OPERATION…………….………………………………...….
4-1.Connects to DUT….………………..………….……..…...
4-2.Start-Up……….....……………………………..………….
4-3.Zeroing…………………………………………………….
4-4.Menu Functions.…..………………………………………
4-5.Measurement Condition…..……………………………...
8
8
8
8
11
18
4.
5.
SPECIFICATIONS…………………………………………...
35
6. MESSAGE CODE.………………………………………….... 42
7. MAINTENANCE....…………………………………………... 43
8. OPTION 1 (BIN Function for LCR-826/827/829 only)……..
8-1. BIN Functions for Components Sorting……………...
8-2. BIN Setting Conditions:...……………………………..
8-3. BIN Range Setting: Component Sorting Range..............
44
44
46
52
9. OPTION 2 (RS-232, for LCR-816/817/819 only)…………… 61

Other manuals for GW Instek LCR-819

Question and Answer IconNeed help?

Do you have a question about the GW Instek LCR-819 and is the answer not in the manual?

GW Instek LCR-819 Specifications

General IconGeneral
TypeLCR Meter
Basic Accuracy0.1%
Measurement ParametersL, C, R, Z, θ
InterfaceRS-232
Power Supply100-240 VAC, 50/60 Hz

Summary

SAFETY TERMS AND SYMBOLS

Warning and Caution Statements

Description of safety warnings.

Safety Symbols

Description of various safety symbols.

Electrical Wiring for United Kingdom

Power Cord Wire Color Coding

Explanation of wire colors and connections.

2. PRECAUTIONS BEFORE OPERATION

Unpacking, Inspection, and Voltage Checks

Procedures for unpacking, inspection, and voltage verification.

4. OPERATION

Connecting to the Device Under Test (DUT)

Explanation of the four-wire measurement.

Instrument Start-Up and Zeroing

Steps to power on and zero the instrument.

Open and Short Circuit Zeroing

Detailed steps for open and short circuit zeroing.

4. Menu Functions

Nominal Value and Measurement Speed Settings

How to input nominal value and select measurement speed.

4. Measurement Conditions

Bias Voltage and Test Frequency Settings

Details on bias voltage and test frequency.

D/Q in PPM, Test Voltage, and Constant Voltage

Settings for PPM, test voltage, and constant voltage.

Memory Store/Recall and Handler Interface

Saving settings and external automation interface.

7. MAINTENANCE

Battery Replacement Caution

Safety notes for battery replacement.

8. OPTION 1: BIN Functions

BIN Functions for Components Sorting

Overview of BIN sorting.

Related product manuals