Cross
High Side Kick
Middle Side Kick
Knee and Elbow Hit
Low Side Kick
Warm
Prompt:
There is a tray
at the bottom,
please do
not kick
Install the suction cup in the screw hole position of the bottom of the
bucket base ( the suction cup with cardboard under the pad, do not
directly adsorb on the ground to avoid moving difficulties)
STEP 1
Fill the base with water or sand to stabilize the base and cover it
with a black lid
STEP 2
Align the upper part of the sandbag with the screw holes of the base,
install and tighten the 12 link screws with a tool Spanner in turn.
STEP 3
Insert the upper sandbag into the lower base
STEP 4
Select the right place to place the sandbag, installation is complete
STEP 5
Note: When moving sandbags, please insert a small card under the
suction cup so that the suction cup and the ground after the separation
in the move, do not hard to avoid damage to the suction cup
MATTERS NEEDING ATTENTION
PRACTICE METHOD
1
3
4
4
5
6
7
04 05