Figure 1 Product components
1 PROFINET module 3 Label with wiring information
2 Ethernet cable (2x) 4 Module holder
Section 3 Installation
D A N G E R
Multiple hazards. Only qualified personnel must conduct the tasks described in this
section of the document.
D A N G E R
Electrocution hazard. Remove power from the instrument before this procedure is
started.
D A N G E R
Electrocution hazard. High voltage wiring for the controller is conducted behind the high
voltage barrier in the controller enclosure. The barrier must remain in place unless a
qualified installation technician is installing wiring for power, alarms, or relays.
W A R N I N G
Electrical shock hazard. Externally connected equipment must have an applicable
country safety standard assessment.
N O T I C E
Make sure that the equipment is connected to the instrument in accordance with local, regional and
national requirements.
English 5