Commercial Air Conditioner
Model: AU122AEERA AB122ACERA
AC122ACERA AD122ALERA
Panel limitation board installation
(1)Install the panel board in the direction shown in the figure.
(2)The incorrect direction will result in water leakage,meanwhile swing and signal receiving are displayed
that cannot be connected.
Electric control box
21