EasyManua.ls Logo

Haier AU482FIBHA - Installation Checks and Testing

Haier AU482FIBHA
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No. Model of indoor unit
Factory No. of unit
Site setting No. System belonged
(A/B)
1
2
3
4
5
6
Check for installation and test run
z Please operate the air conditioner according to the operation manual.
z Check items for test run, put mark in
z Gas leakage from pipe connection ?
z Is the connection wiring of indoor and outdoor unit firmly inserted into the terminal
block?
z Is the connection wiring of indoor and outdoor firmly fixed?
z Is drainage securely arranged?
z Is the ground wire securely and firmly connected?
z Is power supply voltage abided by electric code?
z Is there any noise?
z Does cooling perform normally?
z Does room temperature regulator operate normally?
After installation, please fill in the following form for easy daily maintenance:
8.14 Checks after the installation
Heat insulation treatment of pipe connection?

Other manuals for Haier AU482FIBHA

Related product manuals