EasyManua.ls Logo

Haier HCR7918EIMP - Installation; Unpacking and Environmental Setup

Haier HCR7918EIMP
452 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
GB
Notice:
For a free standing appliance: this refrigerating appliance is not intended to be used as
a built-in appliance
Unpacking
Take the appliance out of the packaging.
Remove all packaging materials.
Environmental conditions
WARNING!
The appliance is heavy. Always handle with at least two persons.
Keep all packaging materials out of children´s reach and dispose them in an environ-
mentally friendly manner.
The room temperature should always be between 1° C and 43° C, since it can inuence
the temperature inside the appliance and its energy consumption. Do not install the appli-
ance near other heat-emitting appliances (ovens, refrigerators) without isolation.
Space requirement
Required space when door is opened:
W1=1217 mm
W2=1528 mm
D1=629 mm
D2=1110 mm
Ventilaton cross-section
To achieve sucient ventilation of the appliance for
safety reasons, the information of the required ventila-
tion cross sections must be observed.
Aigning the appliance
The appliance should be placed on a at and solid sur-
face.
1. Tilt the refrigerator slightly backwards.
2. Set the feet to the desired level.
Make sure the distance to the wall on the hinge side
is at least 10 cm for the door to open properly.
1. 2.
42

Table of Contents

Related product manuals