EasyManua.ls Logo

Haier HRF-599FR/A - Preparation Before Operating Refrigerator; Unpacking the Refrigerator; Check Attached Accessories and Materials; Ensure Refrigerator is Properly Located

Haier HRF-599FR/A
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparation
Unpacking
Remove all packing materials.
Check attached accessories and
materials.
Checking should be conducted to the
Packing List. Contact the local distributor if
shortage is found.
Ensure that the refrigerator is properly
located.
(Refer to section "Location")
Time required before power supply
Connect the refrigerator to power source
at least 6 hours after the refrigerator is sited
and cleaned.
Clean the refrigerator before using.
(Refer to section "Cleaning")
6

Related product manuals