Open
No gas leakage?
5.
Detach the charge hose6.
from the service port, open 2-way valve and 3-way. Turn
Anti countercurrent joint
Gaugemanifold(for
R410A)
2-way valve Liquid Side
3-wayvalveGasSide
Vacuum pump(for R410A)
Tube(for R410A)
Close
2-way valve
3-way valve
Open 90
O
2-way valve
3-way valve
2-way valve
3-way valve
2-way valve
3-way valve
Valve rod cap
Valve rod cap
Serviceportcap
To prevent the gas
leakage, turn the service
port’scap,thevalve rod’scapfor2-w
ay
valve and 3-way’s a little more
than the point where the torque increases sudden
l
y.
After attaching the each caps, check the gas leakage around the caps.
7.
8.
Step 1.
Step 2.
Step 3.
Step 7.
Step 6.
Step 4.
The power source must be exclusively used for air
ƽ
conditioner. (Over I0A)
In the case of installing an air conditioner in a moist place,
ƽ
please install an ea-
For installation in other places, use a circuit breaker as far
ƽ
as possible.
Pipecuttingiscarriedoutwith a pipecutterandbursmust
ƽ
be removed.
After inserting the Àare nut, Àaring work is carried out.
ƽ
Iftherefrigerant of theairconditionerleaks,itisnecessarytodischargeallthe
ƽ
refrigerant. Vacuum ¿rst, then
charge the liquid refrigerant into air conditioner
accordingtotheamountmarkedonthenameplate.
Please do not let other cooling medium, except speci¿ed one (R410A), or air
ƽ
enterintothecoolingcirculationsystem.Otherwise,therewillbeabnormal
1
Power Source Installation
2
CuttingandFlaringWorkofPiping
Flare tooling die
1.Cut pipe
2.Remove burs
3.Insert the Àare nut
CAUTION
rth leakage breaker (GFCI).
4.Flare pipe
Lean
Damage of Àare Crack Partial Too outside
Correct Incorrect
3
On Drainage
It becomes
high midway.
The gap with the
ground is too small.
Thereisthebad
smell from a ditch
It waves.
The end is imm-
ersedinwater.
Pleaseinstallthedrainhosesoastobedownwardslopewithoutfail.
Please don’t do the drainage as shown below.
ƽ
ƽ
Pleasepourwaterinthedrainpan of theindoorunit,and
ƽ
is carried out surely to outdoor.
In case that the attached drain hose is in a room, please
ƽ
applyheatinsulationto
Less than
5cm
con¿rm that drainage
it without fail.
4
CheckItemsforTestRun
Put check mark
in boxes
Gasleakfrompipeconnecting?
Heat insulation of pipe connecting?
Are the connecting wirings of indoor and outdoor ¿rmly
Is the connecting wiring of indoor and outdoor ¿rmly ¿xed?
Is drainage securely carried out?
Is the earth line securely connected?
Is the indoor unit securely ¿xed?
Is power source voltage abided by the code?
Is there any noise?
Isthelampnormallylighting?
Are cooling and heating (when in heat pump) performed normally?
Is the operation of room temperature regulator normal?
Pleasekindlyexplaintoourcustomershowtooperate
through the instruction manual.
Check for Installation and Test Run
Ƶ
inserted to the terminal block?
Ƶ
1
1+2=
kg
R410A
2
kg
2=
1=
B
C
D
FE
kg
A
This product contains fluorinated greenhouse gases covered by 
the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R410A
GWP* value:1975
GWP=global warming potential
Please fill in with indelible ink,
WKHIDFWRU\UHIULJHUDQWFKDUJHRIWKHSURGXFW
WKHDGGLWLRQDOUHIULJHUDQWDPRXQWFKDUJHGLQWKHILHOGDQG
WKHWRWDOUHIULJHUDQWFKDUJH
on the refrigerant charge label supplied with the product.
The filled out label must be adhered in the proximity of the product
charging port (e.g. onto the inside of the stop valve cover).
A  contains fluorinated greenhouse gases covered by the Kyoto 
Protocol
B  factory refrigerant charge of the product: see unit name plate
C   additional refrigerant amount charged in the field
D   total refrigerant charge
E   outdoor unit
F   refrigerant cylinder and manifold for charging 
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
Refrigerant charge labelƵ
the valve rod counterclockwise.
In case of gas leakage, tighten parts of pipe connection. If
leakage stops,
then proceed
FlaretoolforR410A ConventionalÀare tool
Clutch-type clutch-type(Rigid-type) Wing-nut type (Imperial-type)
A
0~0.5mm
1.0~1.5mm
1.5~2.0mm
step 6. If leak continues, remove the refrigerant used for the 
leakage check and flare tubes again. Repeat vacuum and leak and if no 
leakage, proceed to step 6.
0~1/51 inch
3/76 ~1/17 inch
1/17 ~1/8 inch
high pre
ssure in the system casuing damage and possibly personal injuries.