7
• Youcan position the measuring station on alevel outdoor surface
using the base.
• We recommend installing the measuring station securely on an
outdoor wall.
• Install an anchor,screw,nail, etc. in the wall of your choice.
• Hang the measuring station using the opening intended for this
purpose (4).
6. Operation
6.1. Connection to the measuring station
• To connect the base station and the measuring station, place the two
devices as close together as possible.
• After you insert the batteries, the base station automatically searches
for aconnection to the measuring station and performs initial setup. If
the device does not connect automatically,the manual search program
on the base station must be started.
Note
• Initial setup takes approximately 3minutes.
• During the connection attempt, the radio symbol and the LED
indicator (1) on the measuring station will ash.
• Do not press any buttons during setup. Otherwise, values may
not be transmitted correctly and thereisarisk of value errors and
inaccuracies.
• The setup process is completed when the indoor and outdoor
measurement data is displayed on the base station.
• The measured value is automatically updated by the base device
about every 57 seconds.