H&K DALLAS INC., 1343 S.HENDERSON AVE., DALLAS, TX 75223.
INSTALLATION
1. Inspection: Upon receipt, examine the equipment carefully for any damage. Notify the
carrier and H&K immediately if damage has occurred.
2. Unpacking: Remove the unit from the packaging. H&K recommends that the unit re-
main crated until it has reached the installation location.
3. Storage: Store the unit in a weather proof enclosure on a level surface.
CAUTION: If the unit was on it’s side for more than one hour, it should be allowed to
rest in the upright position for at least six hours before starting the refrigeration unit.
This will allow the oil level to stabilize.
4. Location: Allow enough clearance around the refrigerator to facilitate easy closing and
opening of the doors.
The condensing units must have an adequate air supply for cooling purposes to ensure
optimum performance. Therefore, do not block the front and side louvered panels of the
self-contained and remote condensing units.
5. Leveling: It is imperative that the unit be level to allow proper condensate drainage.
The unit should be located on a level floor.
6. Plumbing: Connect the water supply line to the water inlet at the rear of the cabinet.
Provide floor drain near the equipment for drainage.
7. Power Source: Connect the main 3 phase power supply to the electrical panel provided.
The electric panel layout is provided later in this manual.
4