EasyManua.ls Logo

Hangar 9 Easy Fly 40 - Table of Contents

Hangar 9 Easy Fly 40
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
Table Of Contents
Introduction 3
Contents Of Kit 4
Equipment Required 5
Tools And Supplies Required 5
Field Equipment Required 6
Optional Field Equipment 7
Section 1: Assembling The Wings 8
Section 2: Joining The Wing Halves 9
Section 3: Hinging The Rudder And Elevator 12
Section 4: Installing The Aileron Servo Trays 13
Section 5: Assembling The Fuselage 16
Section 6: Installing The Nose Gear 17
Section 7: Installing The Wing Dowels 18
Section 8: Assembling The Fuel Tank 19
Section 9: Installing The Fuel Tank 21
Section 10: Installing The Control Horns 22
Section 11: Installing The Horizontal & Vertical Stabilizers 24
Section 12: Installing The Engine 26
Section 13: Installing The Radio 29
Section 14: Installing The Linkages 32
Section 15: Setting Up The Radio 38
Section 16: Balancing The Model 39
Pre-Flight Check 40
Pre-Flight At The Field 41
Flight Instructions 42
AMA Safety Codes 43
Glossary 44

Related product manuals