EasyManua.ls Logo

Hanover 9760301 - Installation Clearance Requirements

Hanover 9760301
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Installation clearance requirements
When installing the beverage center under a counter, follow the recommended spacing dimensions.
To ensure proper service access and ventilation, the product must have at least 2 inches clearance in the back, 3/8”
at top and 3/8” at sides. The installation should allow the unit to be pulled forward for servicing if necessary.
Do not install the wine cooler/beverage cooler near an oven, radiator, or other heat source.
It is not recommended to install the appliance in a corner or flush against a wall. The door needs to open more than
90° to allow full extension of the shelves. Leave at least 2-4 inches (5-10 cm) of space between the wall and the
appliance to allow for the door opening when it is necessary to place the unit next to a wall or in a corner.
Built in cabinetry dimensions must be at least 24.6 inches (62.5cm) wide by 35 inches (88.9 cm) high by 25 inches
(63.5 cm) deep.
3/8”
1/2”