Harman®  •  P42i Pellet Insert Installation Manual  •  2023 -___  •  08/233 8742-901D
Installation Standard Work Checklist
ATTENTION INSTALLER:
Follow this Standard Work Checklist
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in 
this installation manual.
Customer: ________________________________  Date Installed:  __________________________
Lot/Address:  ________________________________   Location of Stove:  __________________________
  ________________________________  Installer:  __________________________
  Model: ________________________________   Dealer/Distributer Ph # __________________________
        Serial Number:  __________________________
WARNING! Risk of Fire or Explosion! Failure to install appliance to these instructions can lead to a  re 
or explosion.
Appliance Install
 Section 3      YES  IF NO, WHY?
Requirednon-combustibleoorprotection     ________________________________
Veriedclearancestocombustible.      ________________________________
UnitisLeveledandsecured.       ________________________________
Venting/Chimney Section 4
VentingCongurationcompliestoventdiagrams.    ________________________________
Ventinginstalled,sealedandsecuredinplacewithproperclearances.  ________________________________
Exteriorwall/roofashinginstalledandsealed     ________________________________
Terminationsinstalledandsealed.      ________________________________
Electrical Section 1
120VACunswitchedpowerprovidedtotheappliance.    ________________________________
Checkoutletwithmulti-meterforpropervoltage.(115-120VAC)   ________________________________
 Recordvoltagereading:___________
Appliance Setup Section 5
Allpackagingandprotectivematerialsareremoved    ________________________________
Accessoriesinstalledproperly       ________________________________
Manualbagandallit’scontentsareremovedfrominsidetheappliance
andgiventopartyresponsibleforuseandoperation    ________________________________
Startedapplianceandveriedthatallmotorsandblowersoperate
astheyshould.         ________________________________
CheckeddraftusingaManometer.Recordreadings:__________  ________________________________
Duringoperation,verifythatthehopperlidswitch(Ifapplicable)
andpressureswitchareworkingproperlybybrieyopeningthehopper
lidandmaindoorandverifyingthatthefeedmotorisinterrupted.  ________________________________
HearthandHomeTechnologiesrecommendsthefollowing:
Photographingtheinstallationandcopyingthischecklistforyourle.
This checklist remain visible at all times on the appliance until the installation is complete.
Comments:Furtherdescriptionoftheissues,whoisresponsible(Installer/Builder/OtherTrades,etc.)andcorrectiveaction
needed__________________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Commentscommunicatedtopartyresponsible____________________by________________________on__________
     (Builder/GenContractor)(Installer)   (Date)