Sequence of dismantling the exhaust system:
• Open nut 1 and remove in numerical sequence 2...5.
• Open screws 6 and remove with shims 7 and plate 8.
• Open screws 9 and remove with shims 10.
• Open nuts 11 and remove with snap ring 12 and shim 13.
• Open all Allen screws 14 and remove with snap rings 15 and shims 16.
• Open and remove both nuts 17.
• Remove silencer 19 with five identical gaskets 18.
Assembly:
• Assemble in reverse sequence.
• Make sure that all parts are correctly placed and tightened.
• Use anti-seize compound J as specified by HATZ.
62