EasyManua.ls Logo

Hauck BCS-3000M - Page 3

Hauck BCS-3000M
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 3
BCS3000M-9
B. RECEIVING AND INSPECTION
Upon receipt, check each item on the bill of lading and/or invoice to determine that all equipment
has been received. Examine all parts to determine if there has been any damage in shipment. If
equipment is to be stored prior to installation, provide a dry storage area.
IMPORTANT
For optimum use of the BCS panel, it is suggested that the drawings provided by
Hauck be referred to for limit switch and valve installation and wiring. In the event
that a recommended switch or valve is not used, it may be necessary to connect
jumper wire(s) between appropriate terminals in the control panel or burner junction
box. Such determination remains the responsibility of the Customer, based upon
his application, accepted safe installation and operating procedures, and any
applicable insurance guidelines or governmental regulations.
C. DRAWINGS AND SUPPLEMENTAL LITERATURE
Drawing StarJet ESIIB
ESIIB
Tabletop Panel Assy. CY7996 CY7996 CY7996
Drop-in Panel Assy. CY7997 CY7997 CY7997
System Schematic CY7986 CY8078 CY8078
Wiring Diagram CY7995 CY7995 CY7995
External Component Wiring CY8000 CY8114 CY8079
BCI Panel Assembly NA CY7813 CY8034
BCI System Schematic NA CY8108 CY8024
D. INSTALLATION
1. Locate the tabletop panel on a firm support in an area that is protected from the weather
and free from vibration. The drop-in version is designed to install in an existing enclosure.
Reference the panel assembly drawings for mounting dimensions and required cutouts.
IMPORTANT
Operating specifications of 32 to 130 °F (0 to 54 °C), 30 to 95% relative humidity
(non-condensing) should be considered in selecting a suitable location for the
control panel.
2. Provide 120Vac single phase grounded neutral power to the burner control panel. It is
recommended that the customer provide a master disconnect switch to interrupt power
service to the panel. Maintain polarity as indicated on the drawings provided when
connecting the main power source to the panel.
3. Install a heavy gauge (No. 12 AWG minimum) ground wire between the panel ground
connector and "Earth" ground.
IMPORTANT
A ground wire is also required between the burner junction box and the control
panel terminal strip.

Related product manuals