Do you have a question about the Hawker 20FP25H1CT-R and is the answer not in the manual?
Brand | Hawker |
---|---|
Model | 20FP25H1CT-R |
Category | Camera Accessories |
Language | English |
Lists applications like engine starting, ground operations, and emergency backup.
Explains battery construction, materials, and designation system.
Details cell components: electrodes, separators, electrolyte, vent plugs.
Explains charging/discharging chemical processes in Ni/Cd cells.
Defines key terms: current rates, rated current, capacity, endpoint voltage.
Explains charging methods and voltage definitions.
Provides operational parameters and technical cell data.
Defines CAUTION, ATTENTION, NOTE terms for safety communication.
Lists critical safety practices for handling and working with batteries.
Emphasizes recording battery data for airworthiness and warranty.
Outlines procedures for inspecting new batteries upon receipt.
Details steps for commissioning new batteries: checks and initial charging.
Specifies requirements for releasing batteries to aircraft post-maintenance.
Guides investigation steps for batteries removed from aircraft.
Outlines monthly, quarterly, and annual maintenance tasks.
Defines requirements for dedicated battery maintenance shops.
States only approved spare parts from IPL should be used.
References appendices for recommended tools and consumables.
Guidelines for storing charged batteries up to 3 months.
Procedures for preparing and storing discharged batteries up to 5 years.
Details recommissioning batteries after prolonged storage.
Specifies how to prepare and ship batteries complying with regulations.
Describes monthly inspection for batteries on aircraft.
Details quarterly maintenance tasks for airborne batteries.
Outlines annual maintenance procedures for airborne batteries.
Guides reconditioning cells not meeting discharge capacity requirements.
Details checking and adjusting lower pole nut torque during annual maintenance.
Explains how to measure battery insulation resistance.
Outlines procedure for checking electrolyte density in selected cells.
Describes testing vent response pressure after cleaning.
Provides instructions for cleaning disassembled battery components.
Details functional testing for thermostats and thermistors.
Identifies tests/inspections to diagnose faults from unscheduled battery removal.
Outlines inspection and diagnostic steps for unscheduled removals.
Details replacing upper pole nuts, spring washers, and intercell links.
Explains replacing lower pole nuts, sealing caps, and seals.
Provides instructions for replacing the thermostat switch assembly.
Details procedure for replacing the main battery connector.
Guides on replacing the battery case or lid.
Explains process for replacing individual battery cells.
Details replacing insulating material (liners, empty containers).
Outlines commissioning process for repaired batteries.