39
17.3 II charge method (Appendix 3)
• Charge the fully discharged battery with parameters selected from
table below and afterwards charge for two hours at 0.2*I
1
• Check battery current switching to 0.2*I
1
at the stage 1(max) time
presented in the table below.
18. Refit and tighten the vents on the cells within 24 hours after
charge.
19. Refit the lid on the battery.
20. If required, perform Release Task 3.3.
current Stage 1 time (max)
0.4*I
1
180
0.6*I
1
120
0.8*I
1
90
Task 10.2 – Replacement of upper pole nuts, spring washers and links
OPERATING INSTRUCTION AND TECHNICAL REQUIREMENTS (TR) INSTRUCTIONS / EVIDENCE WHEN DEVIATIONS FROM TR
ATTENTION:
• Spare parts used for any repair listed below have to comply with
the IPL
• Before disassembly, discharge the battery with 0.2*I
1
to 0.5 V
per cell.
1. Remove any corroded nuts, spring washers and intercell links from
the cells.
2. Fit new intercell links, spring washers and nuts.
3. Tighten the upper pole nuts on the terminals with the torque in
accordance with section 1.6.2, table 1.
The document reference is online, please check the correspondence between the online documentation and the printed version.