EasyManua.ls Logo

HEX Alton - Final Assembly Steps and Accessories

HEX Alton
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly Guide
33
ASSEMBLY STAGE 28
LOCATE GROUND ANCHOR BRACKETS 0205-57.
LOCATE x4 GROUND ANCHOR BRACKETS 0205-57 AS SHOWN ABOVE, THESE
ALLOW FOR FIXING TO A CONCRETE BASE AT A LATER STAGE IF DESIRED.
PLEASE NOTE: THESE BRACKETS ARE OPTIONAL,
THEY CLAMP INTO PLACE WHEN FIXED TO A
CONCRETE BASE FOR EXTRA STABILITY.
THESE BRACKETS ARE SECURED USING GROUND ANCHOR KIT ONCE THE SHED WALL PANELS ARE FULLY ASSEMBLED (SEE PAGE ‘i’)
0205-57 (x4)