Do you have a question about the Hitachi 4100 and is the answer not in the manual?
Provides guidelines to prevent damage from static discharge and ensure safe handling of equipment.
Details safety measures for electrical connections and power requirements for the system.
Offers safety guidelines for handling and managing batteries within the system.
Provides precautions for protecting data and ensuring system integrity during operations.
Details server physical dimensions, weight, rack space, and chassis contents.
Identifies components that can be replaced in the field and those that are hot-swappable without shutdown.
Details the procedure for replacing a hot-swappable fan assembly, including identifying failed fans.
Details the procedure for replacing the NVRAM battery pack and checking its status via LEDs.
Provides detailed steps for replacing the NVRAM battery module, including before-you-begin checks.
General guidance on hard disk drive failures, recovery processes, and replacement procedures.
Step-by-step procedure for recovering a hard disk drive and ensuring RAID integrity.
Step-by-step procedure for replacing a hard disk drive, including safety precautions.
Provides instructions for replacing a hot-swappable power supply unit (PSU) without server shutdown.
Explains how to restart, shut down, or power off a single server using NAS Manager.
Explains how to restart, shut down, or power off an entire server cluster using NAS Manager.
Guides on how to restart an unresponsive server using the OS console and generate diagnostic logs.
Provides steps to configure the replacement server with necessary IP addresses and settings.
Steps to finalize, verify, and configure the replacement server's settings, including FC link speeds.
Steps to finalize and verify the server configuration after replacement, including license key loading.
Detailed procedures for replacing a single node in a cluster, maintaining cluster state.
Steps for physically installing and configuring the new node within the cluster.
Verifies cluster status, node health, and access to system drives after installation.
Covers replacement procedures when both servers in a cluster need replacement, requiring manual recovery.
Steps for configuring replacement servers, including IP addressing and integration into the cluster.
Final steps to configure, verify, and finalize the system configuration for cluster replacements.
Final steps to verify the overall system configuration, settings, and online status of components.